Almonty reports that South Korea's Sangdong mine began producing saleable tungsten concentrate in June 2026. That is a real new source of supply. How much it adds depends on sustained output and on downstream conversion. The mine has not yet shown full design capacity, and other alternative suppliers may be viable too.

high conviction growth

Research snapshot · updated Nov 12, 2026

State of the art (2026)

China mines about 80% of the world's tungsten and has required export licences for tungsten products since February 2025. The largest new source outside China is Almonty's Sangdong mine in South Korea. Almonty reports that the mine began producing saleable concentrate in June 2026. Its target is to process about 640,000 tonnes of ore a year once fully running. That figure is ore put through the plant, and the tungsten it yields will be a small fraction of it. Almonty's planned expansion and its share of supply outside China are company targets.

Tungsten is now China's second weaponised critical mineral after antimony

Beijing's February 2025 export controls on tungsten products - including ammonium paratungstate (APT), the standard intermediate for almost all refined tungsten chemistry - established the second major weaponisation precedent after antimony's August-December 2024 controls. In 2026 Beijing replaced the existing quota system with a licensing regime that limits export to 15 authorised companies. APT prices have moved from ~$900/MTU at end-2025 to ~$2,250/MTU by mid-March 2026 (+150%) and over $3,000/MTU by April 2026 (+230% in roughly three months). The pattern - sequential licensing, dual-use designations, ultimately military-end-user restrictions - is structurally identical to the antimony playbook. The strategic significance is that tungsten carbide cutting tools, kinetic-penetrator military rounds, EUV lithography pellicles, CVD precursors for semiconductor backend manufacturing, and a long tail of industrial applications have no near-term substitutes. The single highest-leverage forward catalyst is whether China extends the licensing regime to a full embargo on US military end users in late 2026 or 2027.

The mid-tier demand recovers fastest if Sangdong Phase 2 lands on schedule

Tungsten demand splits into three tiers with different sensitivity to supply. Defence demand (kinetic penetrators, armour-piercing rounds) is price-inelastic and underpins a sustained premium. Top-tier industrial demand (EUV pellicles, semiconductor CVD precursors, high-precision carbide cutting tools) is also price-inelastic and locked into long-cycle qualification. The mid-tier - bulk carbide cutting inserts, oil-and-gas drill bits, wear-resistant alloys - is the demand band that has been most disrupted by price-tripling and that recovers fastest if Sangdong Phase 2 lands on schedule. Watch the mid-tier carbide spot market in 2027-Q1 as the leading indicator of whether the supply response has actually rebalanced the market or whether Chinese licensing still sets the price.

Almonty Sangdong is the Western tungsten supply response

Almonty Industries' Sangdong mine in South Korea is the single most important non-Chinese tungsten asset in the 2026-2030 window. Phase 1 operations began on 16 March 2026 processing 640,000 tonnes of ore annually; Phase 2 expansion to 1.2 million tonnes per year is planned for 2027 and would double output to ~4,600 tonnes of tungsten contained metal - enough to meet roughly 40% of global non-Chinese demand at full capacity. Washington has explicitly exempted Almonty's tungsten ores, concentrates and oxides from US retaliatory tariffs, signalling strategic priority. The structural question is whether Sangdong Phase 2 lands on the 2027 schedule and whether US/EU buyers commit to long-term offtake at premiums sufficient to underwrite the project. No second Western project of comparable scale is currently in construction; Tungsten West's UK Hemerdon restart targets Q2 2027 but is structurally smaller.

Explore the deeper analysis in CanaryIQ

Explore what is covered below. These previews show the structure; log in to read the full analysis.

Signal stack

Evidence stacked leading → lagging

8 signals
talent
research
patent
expert
operational
regulatory
market

Technology-native KPIs

Metrics that predict trajectory, tracked over time

4 tracked
APT (ammonium paratungstate) price
China share of global tungsten mine production
Almonty Sangdong Phase 1 ore throughput
Chinese tungsten exporters under 2026 licensing regime

Landscape map

Who builds what, and who depends on whom

115 players · 6 layers

Catalyst calendar

Dated events that will move the position

4 ahead

Technology roadmap

Milestones on the path to maturity

8 milestones

Watchlists

Companies, people and papers, each with a condition for removing it

20 · 19
Companies · 20
People · 19

Decision frameworks

What our view means for your job

Locked
Public Equity
PE / VC
Corporate Leader

Thesis changelog

When our view changed, and why

9 updates

Change our mind

6 disconfirming conditions

You've read the verdict. The file is much deeper.

The full signal stack, technology-native KPIs tracked over time, the landscape of who depends on whom, the dated catalyst calendar, decision frameworks for every desk, live watchlists and a record of every time our view on Tungsten supply chain has changed. All of it is in CanaryIQ.