Solar photovoltaics
Solar is the cheapest electricity ever built, but growth has paused. The IEA expects global renewable additions to fall 11% in 2026. China's installations fell 54% in January to September, yet its 111 GW was still three times India's 35 GW. China makes more than 80% of every stage of the supply chain.
Research snapshot · updated Nov 10, 2026
State of the art (2026)
Solar PV is now the cheapest electricity source ever built, and scale keeps compounding: 2025 added roughly 698 GW (16% growth), pushing cumulative capacity towards 3 TW, with China alone installing about 315 GW. TOPCon has displaced PERC as the mainstream cell, while perovskite-silicon tandems set successive records – LONGi at 34.85% in April 2025 and JinkoSolar at 34.82% in June 2026 – though commercial tandem modules remain pre-volume. The defining tension is supply-chain concentration: China holds roughly 80% of every value-chain step, Tier-1 modules trade near $0.09/W FOB, and structural overcapacity persists. US-delivered modules sit at $0.27–0.32/W as tariffs and a 50 GW-plus domestic build-out reprice the Western market.
Core thesis
Solar panels are the cheapest source of new electricity in most of the world, and more are installed every year. The world added about 510 GW of solar in 2025, of which China added about 315 GW, according to the International Renewable Energy Agency. China also makes about 80% of the panels and of every part that goes into them. JinkoSolar and LONGi ship the most panels, and a price war lasting several years has cut manufacturers' profits. US and EU tariffs raise the cost of installing solar there, and have led to new panel factories in the US. The next improvement is a panel that adds a layer of perovskite on top of silicon to turn more sunlight into power. LONGi holds the efficiency record for it, and Oxford PV is the main Western company working on it.
Perovskite tandem: the next efficiency revolution
Perovskite-silicon tandem cells now set records around 35% – LONGi at 34.85% (April 2025) and JinkoSolar at 34.82% (June 2026, its 33rd certified record) – versus roughly 24% for the best commercial silicon. LONGi's flexible tandem work was named one of China's top-10 scientific advances. The big Chinese makers (LONGi, JinkoSolar, Trina) target volume tandem production around 2027. Oxford PV is the Western leader and has actually been first to ship commercial tandem modules (from late 2024, ~25% module efficiency), with mass production planned for 2027; the open question is 25-year-grade durability, not whether the cell can be built. The West's edge is here, in tandem, not in re-competing on commodity silicon – but China leads on cell efficiency.
Explore the deeper analysis in CanaryIQ
Explore what is covered below. These previews show the structure; log in to read the full analysis.
Signal stack
Evidence stacked leading → lagging
11 signals
Signal stack
Evidence stacked leading → lagging
Technology-native KPIs
Metrics that predict trajectory, tracked over time
4 tracked
Technology-native KPIs
Metrics that predict trajectory, tracked over time
Landscape map
Who builds what, and who depends on whom
84 players · 7 layers
Landscape map
Who builds what, and who depends on whom
Catalyst calendar
Dated events that will move the position
8 ahead
Catalyst calendar
Dated events that will move the position
Technology roadmap
Milestones on the path to maturity
8 milestones
Technology roadmap
Milestones on the path to maturity
Watchlists
Companies, people and papers, each with a condition for removing it
20 · 20
Watchlists
Companies, people and papers, each with a condition for removing it
Decision frameworks
What our view means for your job
Locked
Decision frameworks
What our view means for your job
Thesis changelog
When our view changed, and why
8 updates
Thesis changelog
When our view changed, and why
Change our mind
3 disconfirming conditions
Comparable wave
The historical analogue on the S-curve
Common mistakes
What the market gets wrong right now
You've read the verdict. The file is much deeper.
The full signal stack, technology-native KPIs tracked over time, the landscape of who depends on whom, the dated catalyst calendar, decision frameworks for every desk, live watchlists and a record of every time our view on Solar photovoltaics has changed. All of it is in CanaryIQ.