Small modular reactors

China's 150 MW HTR-PM has sold power commercially since December 2023, though it ran at 44% of capacity in 2025. Its Linglong One missed a first-half 2026 start and was still in testing in October. No Western small reactor generates power yet: TerraPower's Natrium won the first US commercial-scale construction permit in March 2026, and the first are due at Darlington at the end of 2030 and Natrium in 2031.

high conviction More attention than progress emerging

Research snapshot · updated Nov 10, 2026

Core thesis

Small reactors are meant to be built in factories and to cost much less per plant than a full-size reactor. China is ahead. Its HTR-PM plant at Shidaowan has been in commercial operation since December 2023, according to the IAEA. No small reactor is selling power in the United States yet. NuScale's 77 MWe US460 design received the nuclear regulator's standard design approval in May 2025. That approves the design. It is not a licence to build at a site, and NuScale has no firm US order. TerraPower received a construction permit for its 345 MWe Natrium plant at Kemmerer, Wyoming, in March 2026, and the regulator approved X-energy's construction permit on 9 November 2026. Kairos Power is building its Hermes test reactor. Google, Amazon and Meta have each signed deals to buy power from small reactors. The first US units are due between 2027 and 2030.

State of the art (2026)

The US advanced-reactor era opened in earnest in 2026. The NRC's Part 53 framework – the first new reactor-licensing rulebook since 1989 – took effect on 29 April 2026, and TerraPower's 345 MWe Natrium received the first commercial-scale advanced-reactor construction permit on 4 March 2026, with construction now under way at Kemmerer, Wyoming. Demand is led by hyperscalers: Kairos Power's Hermes 2 (50 MWe) anchors the first US Gen IV utility PPA (TVA–Google, Aug 2025) for 2030 operations; X-energy and Dow's Long Mott permit sits in accelerated NRC review; Oklo, Amazon and Meta hold multi-gigawatt pipelines. No SMR yet generates commercial power, but the regulatory and offtake scaffolding is now built.

Explore the deeper analysis in CanaryIQ

Explore what is covered below. These previews show the structure; log in to read the full analysis.

Signal stack

Evidence stacked leading → lagging

9 signals
talent
research
patent
expert
operational
regulatory
market

Technology-native KPIs

Metrics that predict trajectory, tracked over time

4 tracked
Global SMR units under construction or licensed
NRC advanced-reactor applications under review
Corporate SMR power purchase commitments
Levelized cost of energy target

Landscape map

Who builds what, and who depends on whom

58 players · 6 layers

Catalyst calendar

Dated events that will move the position

5 ahead

Technology roadmap

Milestones on the path to maturity

7 milestones

Watchlists

Companies, people and papers, each with a condition for removing it

19 · 20 · 1
Companies · 19
People · 20

Decision frameworks

What our view means for your job

Locked
Public Equity
PE / VC
Corporate Leader

Thesis changelog

When our view changed, and why

8 updates

Change our mind

3 disconfirming conditions

You've read the verdict. The file is much deeper.

The full signal stack, technology-native KPIs tracked over time, the landscape of who depends on whom, the dated catalyst calendar, decision frameworks for every desk, live watchlists and a record of every time our view on Small modular reactors has changed. All of it is in CanaryIQ.