AI infrastructure

AI capacity depends on chips, memory, networks, electricity and cooling arriving together. Which of them runs short varies by site and by workload. More announced compute does not necessarily mean more usable capacity.

high conviction growth

Research snapshot · updated Nov 12, 2026

Core thesis

AI infrastructure spending has scaled to a ~$700-725B combined big-four capex run-rate in 2026, but the constraint long ago shifted from chip design to delivery. Grid connection and on-site generation decide when capacity comes online; HBM and CoWoS packaging cap how many accelerators can be built; and optical interconnect is now the third limit as coppers reach fails at cluster bandwidths. Chips can be ordered; the power, packaging and data-movement to deploy them at gigawatt scale are the active limits. Facilities that arent built cant be filled with NVIDIA Blackwell or Rubin.

State of the art (2026)

State of the art (2026). The AI build-out is running at gigawatt scale - OpenAI's Stargate sites and xAI's Colossus expansion are measured in GW, not megawatts - and the binding limits are no longer GPUs alone but power and the data-centre interconnect. Grid connection and on-site generation gate when capacity comes online (see brief 962); HBM and CoWoS packaging cap how many accelerators can be built; and optical interconnect has become the third constraint as copper's reach fails at the bandwidth the clusters now need (brief 973). The competitive question is who can secure all three - power, packaging and optics - not who has the fastest chip.

Power supply for AI data centres

Electricity is one of the main limits on new AI capacity. Nvidia's GB200 and GB300 NVL72 systems put 72 GPUs in a single liquid-cooled rack, so one data hall needs far more power than older designs. Technology companies have signed nuclear agreements to secure supply. Helion plans to start its Orion fusion plant in 2028 and supply at least 50 MW under its agreement with Microsoft, though no fusion plant has yet delivered power to a grid. Google's agreement with Kairos Power aims for a first small reactor in 2030. We do not have verified figures for power use per rack or per training run that hold across sites.

Explore the deeper analysis in CanaryIQ

Explore what is covered below. These previews show the structure; log in to read the full analysis.

Signal stack

Evidence stacked leading → lagging

11 signals
talent
research
patent
expert
operational
regulatory
market

Technology-native KPIs

Metrics that predict trajectory, tracked over time

4 tracked
Data center capacity delayed/cancelled
NVIDIA data centre revenue Q1 FY2027
Combined hyperscaler AI capex 2026
Hyperscaler AI capex

Landscape map

Who builds what, and who depends on whom

110 players · 8 layers

Catalyst calendar

Dated events that will move the position

6 ahead

Technology roadmap

Milestones on the path to maturity

12 milestones

Watchlists

Companies, people and papers, each with a condition for removing it

19 · 20 · 2
Companies · 19
People · 20

Decision frameworks

What our view means for your job

Locked
Public Equity
PE / VC
Corporate Leader

Thesis changelog

When our view changed, and why

10 updates

Change our mind

4 disconfirming conditions

Comparable wave

The historical analogue on the S-curve

Common mistakes

What the market gets wrong right now

You've read the verdict. The file is much deeper.

The full signal stack, technology-native KPIs tracked over time, the landscape of who depends on whom, the dated catalyst calendar, decision frameworks for every desk, live watchlists and a record of every time our view on AI infrastructure has changed. All of it is in CanaryIQ.